Decision trees and the value of information

Lay out choices and chances as a tree, fold it back to an expected value, and work out how much better information would be worth.

Applied ~11 min8 steps

You will be able to

  • Fold back a decision tree to find the best policy
  • Compute the expected value of perfect information
  • Read a risk profile, and say why the highest expected value may not be the best choice
01

Drill or sell?

Read

You hold an oil lease. You could sell it for 40. Or you could drill, at a cost of 70:

OutcomeChanceRevenue
Gusher0.10.1700
Some oil0.30.3150
Dry0.60.60

A decision tree lays this out in time order: square nodes are your choices, and round nodes are chance.

02

Fold it back

Checkpoint

Work from the right. A chance node's value is its probability-weighted average. A decision node's value is its best branch.

Check yourself

What's the expected valueExpected valueA random variable's probability-weighted average, where the long-run average of many draws settles. of drilling, after the cost?

Show the answer

Answer: 45

0.1 × 700 + 0.3 × 150 + 0.6 × 0 = 70 + 45 + 0 = 115. Then 115 − 70 = 45.

Check yourself

Comparing drilling with selling at 40, which has the higher expected value?

Show the answer

Answer: a

Drilling edges it, by 5. But it's dry 60% of the time, so look at more than the average.

03

Would you drill?

Reflect

A risk profile shows the policy's outcomes and their chances. Drilling means: 60% lose 70, 30% gain 80, 10% gain 630.

The expected value says drill. Yet a loss of 70 might hurt a small company a lot, while selling is a sure 40. The studio can include a risk tolerance, which values options by their certainty equivalent. What would you do, and how much would the size of your company change your answer?

04

How much is knowing worth?

Predict

Predict first

A geologist could tell you the outcome before you decide. With that knowledge, you'd drill on a gusher or some oil, and sell if it's dry. What's the most you should pay?

About 5About 66About 111
Reveal

About 66. Knowing first, you'd expect 0.1×630+0.3×80+0.6×40=1110.1 \times 630 + 0.3 \times 80 + 0.6 \times 40 = 111. Without it, your best is 45. The difference, 111−45=66111 - 45 = 66, is the expected value of perfect informationExpected value of perfect informationThe most it would be worth paying to know the outcome before deciding.. It's an upper limit, because no real test is perfect.

05

Imperfect tests

Explore

Real tests can be wrong. Here's a product launch with a market test whose accuracy you can change.

DExplorable · What is more information worth?

Before you decide, how much should you pay for a test of the market?

What's the most you should ever pay to know for certain whether demand is high?

100
How sure?
0.40
300
−100
50
0.80
15
Launch (chance of high demand 0.40)60.0Don't launch50.0Test says high (0.44): chance becomes 0.73, launch190.9Test says low (0.56): chance becomes 0.14, don't launch50.060.0Decide now112.0After the test+52.0150.0Knowing for certain+90.0

Commit your prediction above to see the result

Make your prediction first; the figure appears when you commit.

Make your prediction to see the result.

Lower the test's accuracy until the test is no longer worth its cost. Now move the chance of high demand toward 0 or 1. When you're already nearly sure, what happens to the value of information?

06

Check your understanding

Checkpoint

Check yourself

A test could tell you the outcome, but you'd make the same decision whatever it said. What's the test worth to this decision?

Show the answer

Answer: a

Information only has value if it could change what you do. Ask that before you commission a study.

Check yourself

As the chance of a gusher, p, changes, keep some oil half as likely as dry. Drilling is then worth 650p − 20. With the sale at 40, at what p are the two options equal? Give three decimals.

Show the answer

Answer: 0.092

650p − 20 = 40, so p = 60 / 650 = 0.092. Your estimate of 0.1 sits very close to that switch point, so a small error in it would change the decision.

Check yourself

Your tree's chance values are rough guesses. What's the most useful next step?

Show the answer

Answer: b

If the decision only switches far from your guess, a rough number is fine. The tree's one-way sensitivity shows those switch points.

07

Try it

In the app

In Scenarios & optimization, choose Decision tree: drill or sell. The Decision tree step shows the expected value of each option, the best policy, the risk profile and the value of perfect information, and a sensitivity chart with switch points.

These results come from the app's built-in tree solver, not a registry method, so there's no Python or R card to run here. The arithmetic above is the same.

08

Recap

Recap
  • Fold a tree back: average at chance nodes, and take the best at decision nodes.
  • Perfect information is worth the gain in expected value from knowing first. It's a ceiling for any real test.
  • Information only has value if it can change your decision.