Track T26
Quality & Process
SPC, capability, DoE and reliability.
Unit 1Process monitoring
- 1Is the process in control?Separate routine variation from signals with limits the process sets for itself, then freeze those limits to watch new production.
- 2Charts for counts and defectsChoose p, np, c and u charts by what you count, read an improvement as a signal, and widen limits with Laney p′ when samples are large.
- 3Catching small shiftsUse CUSUM and EWMA charts, which build up evidence over time, to catch shifts too small for a single point to reveal.
- 4Can the process meet the specification?Compare a stable process with its specification using Cp, Cpk, Pp and Ppk, and read their intervals and assumptions.
- 5Can you trust the gauge?Run a gauge R&R study to split measured variation into the parts, the instrument and the people, before you trust any chart built on it.
Unit 2Designed experiments
- 6Design an experimentVary factors together rather than one at a time, and use fractions, resolution and randomization to get the most from a limited number of runs.
- 7Read the effectsEstimate main effects and interactions from a two-level experiment, judge them when you have no replicates, and test for curvature with center points.
- 8Find the best settingsFollow the path of steepest ascent, fit a curved surface near the peak, and balance several responses with desirability.
- 11Let the runs choose the next runFit a Gaussian process to the runs you have, and let expected improvement pick the next settings, one run or one batch at a time.
Unit 3Life data
- 9Which distribution fits your failures?Keep units still running in the analysis, rank lifetime distributions by AIC, and read B-lives and mission reliability with their uncertainty.
- 10Wear-out, chance failures and comparing suppliersRead the failure rate's shape, test for a constant rate with a battery, and compare groups with a life model that shares one shape.